South OC WQIP Annual Reports


South OC WQIP Annual Reports

The first South OC Water Quality Improvement Plan Annual Report (documenting progress during the 2017-18 reporting period) was submitted to the San Diego Regional Water Board on January 31st, 2019.

South OC Transitional Monitoring Reports

Until the South OC Water Quality Improvement Plan (WQIP) was approved by the San Diego Regional Water Board on June 20th, 2018, the municipal separate storm sewer system (MS4) permit for the watershed management area of south Orange County required submittal of a transitional monitoring and assessment report by January 31st of each year, covering a monitoring reporting period of October 1 through September 30. See below for links to the Transitional Monitoring and Assessment Reports prepared for 2015-15 and 2016-17.

2017 Report of Waste Discharge Submittal to the San Diego Regional Water Board

A report of waste discharge (ROWD) was collectively prepared and submitted by the Counties of Orange, Riverside, and San Diego, on December 27, 2017.
The ROWD and all of its appendices are available for review and download at the link below:
A Regional Monitoring and Assessment Report (RMAR) for the South Orange County Watershed Management Area (South OC WMA) was included as part of the ROWD in Appendix D. The RMAR for the South OC WMA is available for review at the link below: