Watershed & Coastal Resources Division, RDMD, Orange County, California
Orange County, California
""
Who We Are Problem Reporting Hotline Stormwater Program Watersheds Public Education Rainfall & Weather
"" "" "" "" """" ""
""
""
""

Watershed Introduction
Supervisorial Districts
Regional Board Boundaries
City Boundary Maps
Detailed Maps
Aerial Maps
Wetlands
Coastal Maps
Description of Corps of Engineers Process
TMDLS
Resource Links

""
""

Introduction

Table of Contents

List of Acronyms""

Sections I - V

Section VI
Part 1
Part 2
Part 3

Section VII

Section VIII

PDFDownload Report

Select a Watershed   
Newport Bay Watershed - Reports & Studies
Land Use introduction image

Newport Bay / San Diego Creek Watershed
Project Study Plan
April 1999

 
""
VIII. DETAILED COST BREAKDOWN
""

For accounting and administrative purposes, all tasks are categorized by cost subaccount as described in the Scope of Activities. Acceptance of the product of in-kind services will be at the purview of the Corps. Any applicable guidance for specific work items will be specified at the appropriate locations of the detailed task descriptions (Scope of Activities), and will be provided at the beginning of work, or earlier. The general guidelines and criteria embodied in the Planning Guidance Notebook (ER 1105-2-100), EC 1105-2-206 and EC 1105-2-208 will provide overall direction for the Government and the Sponsors in problem identification, plan formulation, impact assessment, evaluation, and report preparation during the feasibility phase.

To insure timely and responsive completion of the in-kind services, the Sponsors and the Government will all designate a study manager whose responsibility is to conduct the feasibility study. The study managers will establish a coordination procedure that will permit daily contact. The Sponsors' study manager will be responsible for directing the conduct of all in-kind services and for transmitting the information to the Government at the required times. The Government's study manager will be responsible for providing overall policy and general direction for the in-kind services, incorporation of the Sponsors' work into other study elements, and coordination of the in-house review of the Sponsors' work. Together, the respective study managers will resolve any comments produced by the in-house review and will agree on the procedure for completing the in-kind work to the satisfaction of both parties.

 
Newport Bay Watershed Study
Detailed Cost Breakdown and In-Kind Services
 

SA#

TASK DESCRIPTION

SUBTASK COST

TOTAL FUNDED AMT.

IN-KIND VALUE

TOTAL SUBACCOUNT COST

01

Public Involvement

$33,400

$34,500

$67,900

01.A

Public Involvement Plan

$6,500

$3,000

$3,500

01.B

Initial Public Workshop

$4,500

$2,500

$2,000

01.C

Additional Study Progress Briefings

$17,600

$9,600

$8,000

01.D

Website and Newsletters

01.D.1

Establish Website

$11,200

$1,200

$10,000

01.D.2

Semi-Annual Newsletters & Website Updates

$13,300

$5,300

$8,000

01.E

Watershed Education

$9,800

$8,800

$1,000

01.F

Final Public Meeting

$5,000

$3,000

$2,000

02

Institutional Studies

$13,200

$6,200

$19,400

02.A

Financial Analysis & Planning

$13,000

$11,000

$2,000

02.B

Water Rights, Regulations, and Legal Considerations

$6,400

$2,200

$4,200

02.C

Legal Responsibility for Remediation by Other Parties

$0

03

Social Studies

$3,300

$3,300

$0

$3,300

04

Cultural Resources

$27,000

$20,000

$7,000

$27,000

05

Environmental Resources

$221,000

$35,000

$256,000

05.A

Defining Existing Conditions

05.A.1

Riparian Habitat Assessment

$69,600

$69,600

$0

05.A.2

Water Quality Assessment

05A2.1

Analysis of Surface Water and Groundwater Quality

$10,700

$2,700

$8,000

05A2.2

Water Quality Monitoring Activities

$6,400

$400

$6,000

05.A2.3

Project Alternative Effects on Water Quality

$5,400

$5,400

$0

05.A2.4

Address TMDL Objectives

$5,400

$1,400

$4,000

05A.3

HTRW Evaluation Goals and Objectives

$8,600

$8,600

$0

05.B

Ecosystem Restoration and Goals and Objectives

$32,100

$27,100

$5,000

05.C

Environmental Opportunities

05.C.1

Restoration Alternatives

$16,100

$14,400

$2,000

05.C.2

Maintenance of Channels and Basins

$5,400

$3,400

$2,000

05.C.3

Recreation Needs and Opportunities

$10,700

$5,700

$5,000

05.D

Environmental Benefits

05.D.1

Environmental Outputs

$32,100

$32,100

$0

05.D.2

Recreation Outputs

$10,700

$7,700

$3,000

05.E

Env. Appendix Including NEPA/CEQA Documentation

05.E.1

F3 Report

$14,800

$14,800

$0

05.E.2

F4 Report

$1400

$14,000

$0

05.E.3

F5 Public Draft Report

$14,000

$14,000

$0

06

Fish and Wildlife Service Participation

$50,700

$0

$50,700

06.A

Habitat and Species Ground Surveys

$13,000

$13,000

so

06.B

Planning Aid Report (F3)

$6,500

$6,500

$07

06.C

Coordination Act Report (F4)

$13,600

$13,600

$0

06.D

Meetings and Coordination

$17,600

$17,600

$0

07

Economic Studies

$79,000

$8,000

$87,000

07.A

Inventory of Erosion Damages

$6,500

$6,500

07.B

Inventory of Sediment Related Maintenance Costs

$8,100

$4,100

$4,000

07.C

TMDL Implementation Costs

$6,500

$6,500

$0

07.D

Recreation

$8,100

$4,100

$4,000

07.E

Development Growth

$14,500

$14,500

$0

07.F

Erosion Damage Assessment

$9,700

$9,700

$0

07.G

Incremental Cost Analysis

$9,700

$9,700

$0

07.H

Compute Annual Cost

$4,900

$4,900

$0

07.I

Habitat Benefits

$6,500

$6,500

$0

07.J

Tradeoff Analysis

$4,900

$4,900

$0

07.K

Prepare Economic Appendix

07.K.1

Economics F3 Report

$2,600

$2,600

$0

07.K.2

Economics F4 Report

$2,500

$2,500

$0

07.K.3

Economics Public Draft Report

$2,500

$2,500

$0

08

Survey & Mapping

$225,700

$96,200

$321,900

08.A

Collection of Existing Mapping

$6,500

$2,500

$4,000

08.B

New Aerial Photography and Contour Mapping

$240,600

$148,400

$92,200

08.C.1

GIS/LIS Input for F3

$47,600

$47,600

$0

08.C.2

GIS/LIS Input for F4

$27,200

$27,200

$0

09

Hydrology, Hydraulics, Sed. Transport & Groundwater

$478,000

$0

$478,000

09.A

Hydrology

09.A.1

Collect Existing Information

$8,000

$8,000

$0

09.A.2

Collect Rainfall-Frequency Analyses

$8,000

$8,000

$0

09.A.3

Available Streamgage Data

$16,000

$16,000

$0

09.A.4

Construct Rainfall-Runoff Models

$32,000

$32,000

$0

09.A.5

Develop Balanced Hydrographs

$20,000

$20,000

$0

09.A.6

Identify Dry Season & Low Flows

$20,000

$20,000

$0

09.A.7

Reconn-level Hydrologic Design of Alts

$20,000

$20,000

$0

09.A.8

Determine w/project Discharge-Frequency Curves

$20,000

$20,000

$0

09.A.9

Review Operations of Existing Reservoirs

$10,000

$10,000

$0

09.A.10

Coordinate With Study Team

$11,000

$11,000

$0

09A.11

Prepare Hydrologic Documentation

$10,000

$10,000

$0

09.B

Hydraulics

09.B.1

Collect existing information

$7,000

$7,000

$0

09.B.2

Review As-builts - Structures, etc. for Channel Configuration

$7,000

$7,000

$0

09.B.3

Field Studies and Prepare Field Notes, Sketches, and Photos

$6,000

$6,000

$0

09.B.4

Without Project HEC/HEC-2 RAS

$40,000

$40,000

$0

09.B.5

Reconn-level Hydraulic Design for Alts.

$20,000

$20,000

$0

09.B.5.1

Detention Basin Alternative Design

$15,000

$15,000

$0

09.B.5.2

Channelization/Channel Restoration Alternatives

$15,000

$15,000

$0

09.B.6

With-Project HEC/HEC-2 RAS

$15,000

$15,000

$0

09.B.7

Coordinate with Study Team Members

$11,000

$11,000

$0

09.B.8

Prepare Hydraulic Documentation

$10,000

$10,000

$0

09.C

Sedimentation

09.C. 1

Collect Existing Information

$6,000

$6,000

$0

09.C.2

Prepare Geomorphic Analysis

$7,000

$7,000

$0

09.C.3

Sediment Sampling

09.C.3.1

Collect Bed Samples in Active Erosion Areas

$7,000

$7,000

$0

09.C.3.2

Collect Foothill Basin Sediment Samples

$7,000

$7,000

$0

09.C.4

Prepare Sed. Analysis for Existing/Future Conditions

09.C.4.1

Sed. Yield for 10-,25-,50-, 100-yr events

$8,000

$8,000

$0

09.C.4.2

Evaluate Suspended Sediment Data at Gages

$8,000

$8,000

$0

09.C.4.3

Use SAM/Determine Inflow/Outflow by Reach

$8,000

$8,000

$0

09.C.4.4

Non-Damaging Flood Freq/Bridges - Bank Protection

$8,000

$8,000

$0

09.C.4.5

Eval. Sediment Trapping of Existing Structures

$8,000

$8,000

$0

09.C.5

Estimate Sediment Delivery to Existing Basins and Bay

09.C.5.1

Historical Delivery Using Previous Assessments

$6,000

$0

09.C.5.2

Compare New Sediment Estimates with Historical

$6,000

$6,000

$0

09.C.5.3

Estimate Size/Frequency of Events Impacting Bay

$6,000

$6,000

$0

09.C.6

Design for Stable Channels Sed Basins

$6,000

$6,000

$0

09.C.7

SAM Sediment Analysis for With-Proj Conds.

09.C.7.1

Evaluate Alt Impacts on Bed Trapping/Scour

$12,000

$12,000

$0

09.C.7.2

Repeat Transport Analyses

$10,000

$10,000

$0

09.C.8

Review Existing Maint. Activities/Develop Plan

$10,000

$10,000

$0

09.C.9

Coordination and Prepare Documentation

$10,000

$10,000

$0

09.D

Groundwater

09.D.1

Collect Available Groundwater Data

$12,000

$12,000

$0

09.D.2

Investigate Effects on Water Quality

$12,000

$12,000

$0

10

Geotechnical Investigations

$46,000

$0

$46,000

10.A

General Assistance

$6,000

$6,000

$0

10.B

Geologic Conditions of Watershed and Bank Stability